Iberdrola – Castejón (Spain)
Distributed control system SAT and commissioning for the Castejón (Navarra) combined cycle plant. One gas turbine and one steamer on the same shaft with a total installed capacity of 400 MW. Implementation of continuous and sequential control, complete development of the graphic system and operation interface, historian, remote control of the plant, functional tests and performance tests until the commercial operation started.

The Iberdrola Group is today a world leader in renewable energies, with more than 43,421 MW of renewable capacity installed worldwide at the end of the first half of 2024. The Castejón power plant (Navarra) is a combined cycle thermoelectric power plant with an installed capacity of 400 MW. In the same town there are two other combined cycle plants belonging to TOTAL.