Global 3 Energy – Escatrón (Spain)
Distributed control system SAT and commissioning for the Ingnis Energía Combined Cycle in Escatrón (Zaragoza) in Spain. Once Through Steam Generators (OTSG) type boilers, General Electric gas turbines and s Siemens steamer, with a total installed power of 252 MW.

The Global 3 Energy plant was acquired by the Ignis Group in 2021. Initially conceived as a Peaker power generation plant, it became a combined cycle plant in 2009, after the installation of an OTSG boiler. It is located in Escatrón (Zaragoza) and has an installed capacity of approximately 275 MW.