ERG C.C. ERG Nord X – Prioro (Italy)
Distributed control system SAT and commissioning for the ERG combined cycle in Priolo (Sicily), Italy. With 4 General Electric gas turbines plus a steam turbine for a total installed power of 472 MW. Generation of special sequences, continuous control and adaptation of control algorithms to meet network requirements.

ERG is a leading European operator in the renewable energy sector with a presence in seven countries. ERG Nord is a combined cycle plant with 4 GE gas turbines of 90 MW each plus a steam turbine. It has a total installed capacity of 472 MW.