Aragonesas Industrias y Energía – Sabiñánigo (Spain)Development of the application for the automation of the new plants at Aragonesas de Industría y Energía in Sabinanigo (Spain). Assistance in powering up new equipment and system commissioning . After 100 years in operation, the Sabiñánigo factory in Huesca structures its activity around 12 products grouped into four […]
Engineering Projects
2005 – Tüpras Refinery – Izmit (Turkey)
Tüpras Refinery – Izmit – (Turkey)Hardware FAT testing of all hardware cabinets for Tüpras’ new facility in Izmit, Turkey. The Tüpraş refinery in Izmit, Turkey, is one of the oldest and most important refineries in the country. It started its production in the year 1961 with a process capacity of one million tons of crude […]
2004 – Iberdrola – Aceca (Spain)
Iberdrola – Aceca (Spain)Distributed control system SAT and commissioning for the Aceca (Spain) combined cycle plant. One gas turbine and one steamer on the same shaft with a total installed capacity of 400 MW. Implementation of continuous and sequential control, complete development of the graphic system and operation interface, historian, remote control of the plant, […]
2004- Iberdrola – Arcos de la Frontera (Spain)
Iberdrola – Arcos de la Frontera (spain)Distributed control system SAT and commissioning for the Arcos de la Frontera combined cycle plant in Cadiz (Spain). With three groups, two single-shafts with a gas turbine and a steam turbine, and another group with two gas turbines and a steam turbine and an installed total of 1600 MW. […]
2003- Iberdrola – Castejón (Spain)
Iberdrola – Castejón (Spain)Application development for the automation of the new water well filtration system at Iberdrola’s combined cycle facilities in Castejón (Spain). DCS power-on, SAT and commissioning of this new system. The Iberdrola Group is today a world leader in renewable energies, with more than 43,421 MW of renewable capacity installed worldwide at the […]
2002- Iberdrola – Castejón (Spain)
Iberdrola – Castejón (Spain)Distributed control system SAT and commissioning for the Castejón (Navarra) combined cycle plant. One gas turbine and one steamer on the same shaft with a total installed capacity of 400 MW. Implementation of continuous and sequential control, complete development of the graphic system and operation interface, historian, remote control of the plant, […]