Iberdrola – Castellon (Spain)Distributed control system SAT and commissioning for the Iberdrola Castellón 4 combined cycle plant in Spain. Two gas turbines and a steam turbine with a total installed capacity of 1600 MW. Implementation of continuous and sequential control, complete development of the graphic system and operation interface, historian, remote control of the plant, […]
Spain
2007 – Iberdrola – Cartagena (Spain)
Iberdrola – Cartagena (Spain)Distributed control system SAT and commissioning for the Iberdrola combined cycle plant in Cartagena (Murcia) in Spain. Two gas turbines and a steam turbine with a total installed capacity of 800 MW. Implementation of continuous and sequential control, complete development of the graphic system and operation interface, historian, remote control of the […]
2006 – Aragonesas Industrias y Energía – Sabiñánigo (Spain)
Aragonesas Industrias y Energía – Sabiñánigo (Spain)Development of the application for the automation of the new plants at Aragonesas de Industría y Energía in Sabinanigo (Spain). Assistance in powering up new equipment and system commissioning . After 100 years in operation, the Sabiñánigo factory in Huesca structures its activity around 12 products grouped into four […]
2004 – Iberdrola – Aceca (Spain)
Iberdrola – Aceca (Spain)Distributed control system SAT and commissioning for the Aceca (Spain) combined cycle plant. One gas turbine and one steamer on the same shaft with a total installed capacity of 400 MW. Implementation of continuous and sequential control, complete development of the graphic system and operation interface, historian, remote control of the plant, […]
2004- Iberdrola – Arcos de la Frontera (Spain)
Iberdrola – Arcos de la Frontera (spain)Distributed control system SAT and commissioning for the Arcos de la Frontera combined cycle plant in Cadiz (Spain). With three groups, two single-shafts with a gas turbine and a steam turbine, and another group with two gas turbines and a steam turbine and an installed total of 1600 MW. […]
2003- Iberdrola – Castejón (Spain)
Iberdrola – Castejón (Spain)Application development for the automation of the new water well filtration system at Iberdrola’s combined cycle facilities in Castejón (Spain). DCS power-on, SAT and commissioning of this new system. The Iberdrola Group is today a world leader in renewable energies, with more than 43,421 MW of renewable capacity installed worldwide at the […]





